Four stages. Nothing improvised.

Every project runs the same way, from the first walkthrough to the eleven-month warranty visit.

  1. I

    Discovery

    A principal walks the property with you and your architect. You leave with a real budget range and a real calendar, not a placeholder.

  2. II

    Preconstruction

    Drawings, allowances, and subcontractor bids locked before demolition. Our permit team files with Miami-Dade while the drawings are still warm.

  3. III

    Construction

    One superintendent, one schedule, weekly owner walkthroughs, and a shared photo log updated every Friday.

  4. IV

    Closeout

    Punch list, certificate of occupancy, warranty binder with every NOA and product spec, and a walkthrough at eleven months before the warranty year closes.