What a build like yours costs.
Set the scope, finish level, and square footage. The range reflects current Miami-Dade construction costs, including labor and HVHZ compliance.
1,800 sq ft
Planning range
$735K – $1,091K
- Cost per sq ft
- $408 – $606
- Construction window
- 33 – 39 weeks
- Permit & design phase
- 8 – 14 weeks
Directional only. Final pricing follows site review, drawings, and a line-item scope.
How to read it
A range, not a quote.
The low end assumes a sound structure, straightforward access, and finishes selected from stocked lines.
The high end covers structural surprises, custom millwork, imported stone, and long-lead fixtures.
Design, engineering, and permit fees run outside the construction number and vary by jurisdiction.
Your real number comes from a site walk, drawings, and a line-item scope with real subcontractor quotes.